Projects Completed

2002 - 2003

Interfor – Hammond Cedar
Project Description:

  • Installation of new #2 Gang Edger
  • Extension of bin sorter line including fabrication/installation of structural
  • Fabrication and installation of Trimline infeed transfer – 12 Chain Runs
  • Fabrication and installation of residual conveyors, stairs and walkways
  • Fabrication and installation of Trimline reman return line
  • Installation of gang edger, out feed tailings belts and landing decks


Pope & Talbot Ltd.
Project Description:

  • Installation of board turner equipment
  • Installation of lug loader
  • Installation of sawmill trimmer optimizer line
  • Installation of “Newnes - High Grader” sorter / stacker line
  • Installation of double arbour gang installation
  • Installation of optimized board edger equipment

Slocan – Takama Division
Project Description

  • Installation of “Gemafor” trimmer line
  • Installation of “Val Kone” 27” debarker
  • Installation of “Val Kone” 35” debarker
  • Erection and construction of Pre-engineered/Fabricated buildings
  • Installation of chipper equipment
  • Design, engineering and installation of log deck line

Weldwood – 100 Mile
Project Description:

  • Installation of new stick handling system
  • Installation of lug loader
  • Installation of tilt hoist assembly

Weldwood – Hiatha Division (Hinton, Alberta)
Project Description:

  • Installation of edger optimizer line
  • Installation of VDAE gang edger

Caulson Mfg.
Project Description:

  • Installation of “ Flare” edger

Weyerhauser – Kamloops
Project Description:

  • Installation of Sharkfin Board Turner in Planer Mill
  • Construction of new fuel tank containment compound
  • Engineer and fabricate structural steel; install complete with new debarkers
  • Engineer, fabricate structural for C/Frame carriage complete installation
  • Installation of “Newnes” gang edger
  • Installation of overhead crane rails, trollies, etc.
  • Installation of “Newnes” optimized board edger
  • Installation of chippers

Chemainus Forest Products Ltd.
Project Description:

  • Design, engineering and construction of new packaging line building
  • Design, engineering, fabrication and installation of packaging line equipment
  • Installation of new stacker and strapper equipment

Northland Forest Products Ltd.
Project Description:

  • Installation of 20 unit bin sorter extension

Nu-Westech Engineering Ltd.
Project Description:

  • Fabrication and installation contractor for all paper plant structural and maintenance improvements at Scott Paper Ltd. paper plant in New Westminster, B.C.
  • Construction / Modifications for seismic upgrade – Pitt Meadows Fire Hall

Federated Co-Operatives – Canoe, B.C.
Project Description:

  • Installation of complete log deck line including building and mechanical steel erection. Installation of all log deck equipment line

Click here to view projects completed in 2000 – 2001.