“International Forest Products have used High Grade Mill Installations Ltd. As the site contractor at Fraser Mills Divisions for the demolition and cleanup of the sawmill site from October 2001 to date.
During this time they have demonstrated a very professional approach to all aspects of their work and have followed all required policies and procedures.
High Grade Mill Installations have an excellent safety record on this site with no lost time or serious injuries. They adhered to a ridged joint safety program developed between Interfor and High Grade specific to the task at hand.
I would use High Grade Mill Installations as a site contractor for future projects.”
Dan Vilac
Maintenance Supervisor
Interfor